# Northrop Grumman Technology Accelerator 2026 — Application Packet

**Apply URL:** https://www.fedtech.io/programs/northrop-grumman-technology-accelerator  
**Round 1 closes:** Wednesday, **July 1, 2026**  
**Round 1 notification:** July 7 · **Round 2 form due:** July 13 · **Final:** July 27  
**Program:** August–October 2026 · ~3 hrs/week · virtual · no cost  

**FedTech alumni:** ISS graduated FedTech Accelerator **2021**.

---

## One sentence (thesis)

When the iron major asks *“What’s holding the movement?”* and the log warrant is still rebuilding the LOGSTAT, ISS gives the whole staff the same running estimate—pacing items, Class I–X, convoy windows, and RSOI gates—in one picture that still works when SATCOM drops.

---

## One paragraph (why Northrop should care)

Deployment is a **synch problem**, not a slide problem. The S3 fights the movement plan; the log CWO fights **pacing items**; the iron major turns commander guidance into tasks that do not miss an ATO or port window; the XO holds battle rhythm so LOGSTAT, PERSTAT, and the running estimate are not rebuilt from twelve sources every morning; and the brigade commander needs one honest answer: *Can we receive, stage, move, and sustain—on time?* NG’s platforms only matter if that staff can execute. SHIELD/ATLAS is the **logistics warfighting function spine**—live today at https://secureassure.app — that fuses personnel, equipment, supply classes, convoys, RSOI checklists, and go/no-go into one staff picture without replacing existing C2 or enterprise systems. We are software-only (integration-first, DDIL-native), FedTech-proven, and seeking NG collaboration on **field sustainment visibility and deployment/RSOI decision support**—not hardware manufacturing.

---

## Round 1 — copy/paste form fields

| Field | Value |
|-------|-------|
| **Company Name** | Integrated Services and Solutions LLC |
| **Company Website URL** | https://secureassure.app |
| **Company LinkedIn URL** | *(operator: your company or founder profile URL)* |
| **Applicant First Name** | Terry |
| **Applicant Last Name** | Flood |
| **Applicant Email** | mr.terryflood@gmail.com |
| **State** | Texas |
| **City** | Pflugerville |

---

## Attachments (recommended)

**Primary live proof (print to PDF for upload):**

1. **Staff Sustainment WFF hub** — https://secureassure.app/staff-sustainment  
   **Guided walkthrough (stakeholders):** https://secureassure.app/logistics-walkthrough  
   - Click **LOAD DEMO PICTURE** → shows pacing item down, Class III amber, RSOI 38%, active LOGPAC  
   - Role tabs: Iron Major · Log CWO · S3 · XO · Bde Cdr  

2. **One-page leave-behind** — https://secureassure.app/capability-statement-combined (Print → Save as PDF)

**Logo:** `server/public/shield-atlas-mark.svg` (export PNG if required)

**Do not attach:** classified material, export-controlled SBIR drafts, or confidential customer data.

---

## Live proof endpoints (for Round 2 / live pitch)

| Proof | URL |
|-------|-----|
| Staff WFF picture (API) | `GET /api/sustainment/staff-wff?unitId=bn-hq&role=iron-major` |
| Demo seed (POST) | `POST /api/sustainment/demo-seed` body `{"unitId":"bn-hq"}` |
| Iron major dashboard | `GET /api/sustainment/dashboard?unitId=bn-hq` |
| Auto LOGSTAT | `GET /api/sustainment/logstat?unitId=bn-hq` |
| RSOI / theater checklists | `GET /api/sustainment/theater-checklists` |
| Unified COP (all WFF) | `GET /api/platform/cop/unified?unitId=bn-hq` |

---

## Staff roles → what changes (not audit — operations)

| Who | What gets better |
|-----|------------------|
| **Iron major** | Pacing items and CCIR tied to live sustainment status—not “check with S4” |
| **Log CWO (921A)** | Class I–X, CSR/RSR, maintenance pipeline in one WFF view |
| **S3** | Movement plan + sustainment risk before committing the scheme |
| **XO** | Running estimate / synch without rebuilding the book from scratch |
| **Brigade commander** | Defensible go/no-go on deployment, RSOI, and sustainment |

---

## Round 2 prep (July 7–13)

Expect deeper questions on:

- **Deployment / RSOI** — theater phase, checklist %, blockers  
- **Pacing items** — FMC/PMC/NMC with auto CCIR when pacing item drops  
- **Movement** — convoy / LOGPAC status, MSR gates  
- **Supply** — Class III/V/VIII/IX thresholds, LOGSTAT auto-generation  
- **FedTech track record** — 2021 graduate + prior SBIR proposals via FedTech  

**30-second opener:**

> “We cut the time between ‘something’s wrong’ and ‘the right people know what to do’—across depot, port, convoy, and field—for the iron major, log warrant, and S3 on the same picture. Live at secureassure.app/staff-sustainment. FedTech alum. Software only—no hardware pitch.”

---

## Post-submit

1. Screenshot confirmation → `docs/submissions/2026-07-01_ng-accel-receipt/`  
2. Update `docs/pipeline/pipeline.json` `NG-ACCEL` status  
3. Update `data/agent-sprint.json` task `NG-ACCEL-APPLY`

*Identity: `docs/canonical/00_operator_identity.md` · CAGE 9VKK3 · UEI C7YDV3P8EHL7 · SDVOSB-pending*
